Neville Morrison, our production co-ordinator, has been with RGA for 40 years. He was first employed as a boilermaker but was soon discovered to be an exceptional employee who was able to reduce the amount of time the company had been spending on some jobs by 50 percent. Although he was quite young at the time, he was promoted to …
Essential Energy order 10x 1.5t Self Loading Cable Trailers – February 2025
Essential Energy has ordered 10x 1.5t Self Loading Cable Trailers, with the first 5 units delivered this month and the next in March. All are supplied with a range of optional equipment, including hydraulic front jack legs, hydraulic spindle brake, 500kg drum rotator, foot control for drum rotator, operator interlocked guard system and 1200x900mm split drum. These new trailers will …