Redmond Gary Australia has designed and delivered two special hydraulic cable pushers that were purpose built for German contractor ea.R Energieanlagen Ramonat GmbH for installation of cables for the Verbund Hydro Power AG extension project in the south of Austria. Cables had to be installed at a maximum altitude of 1772 metres located in ReijBeck and Kreuzeck Mountains in the …