Redmond Gary Australia has been approached by Essential Energy’s HSE Design and Improvements Coordinator who had the idea to further develop the fibre reinforced dunnage that is currently being used for their MEWP’s and Crane Borers. The problem was discussed regarding using pole jacks on unstable or soft surfaces. Suitable dunnage block was developed in conjunction with Essential Energy. The …
Redmond Gary Australia at the Bicsi Exhibition (May, 2016)
Redmond Gary Australia exhibited once again at the Bicsi South Pacific Conference and Exhibition Centre at Darling Harbour, Sydney. The Bicsi exhibition is all about installation of fibre optic cables. Traditionally, representatives of Bicsi have been involved in the construction industry putting fibre optic networks into high rise buildings and other infrastructure projects but now they are expanding their operations …
New 2.5 Tonne Self Loading Cable Trailer (May, 2016)
Redmond Gary Australia has introduced a 2.5 tonne Self Loading Cable Trailer (SLCT) into our range of cable handling equipment. This new design has evolved by aiming to meet our customers’ specific operational requirements, including the ability to load from uneven ground and enable one operator to safely and efficiently load drums of up to 2500kg and at the same …