Redmond Gary Australia has continued its investment in specialised equipment to test its range of winches. The Redmond Gary Engineering team has designed and manufactured a dynamic winch tester to test winches in accordance with the Australian Standards with loading capacity up to 100kN. The tester is anchored to concrete piers in Redmond Gary’s workshop and the winch is placed …
RG supplies 3 x 40kN skid Mount to EC & M LTD (July, 2014)
3 x 40kN skid Mount Winches were supplied EC & M LTD. The machines have been shipped to Western Australia where they will be used on the Wheastone Project at Onslow and 2 will be located at the Roy Hill Mine located in the Pilbara. The winches were specially designed to incorporate bunded base and other special features to meet …