Stowe Australia Takes Delivery of New 6 Tonne Self Loading Cable Drum Trailer (November 2019)

Brad O’Hara from Stowe Australia visited Redmond Gary Australia to inspect their new 6 Tonne Self Loading Cable Drum Trailer prior to taking delivery. The Trailer was demonstrated in all modes of operation and the unit was supplied with a wide range of options including 1,000kg drum rotator, 2000kg Capstan Winch mounted inside the rear cross member and large toolbox across the drawbar. Brad also had the opportunity to inspect the workshop at Redmond Gary Australia and view a number of other items of equipment that we make. The new trailer will be based at Stowe’s Penrith depot and used for the installation of underground and overhead cables. Pictured are David Semionov – Customer Support Officer, Redmond Gary; Brad O’Hara – Western Division High Voltage Manager, Stowe Australia and Darren Hoare – Customer Support Officer, Redmond Gary